Main water connection, hall area (ground level)
Main water connection includes: Inflow: 1/2“, outflow: DN 50. Installation of piping aboveground from utility / supply duct (hall) or
Details
If at all possible, the piping will be laid in utility ducts, but may have to run above ground if the location of the connection point ordered makes this necessary.
Contact us for an individual quote on special installations, such as those requiring larger main connection fittings.
A surcharge amounting to € 121.00 will be raised for any order/plans submitted later than 14 calendar days prior to the start of the trade
fair.
For erecting a raised platform on your stand, 80 mm min height
clearance is required for laying pipes.
It is imperative that a ground plan has to be submitted if a main water
connection is required.
Contact us for an individual quote on special installations, such as those requiring larger main connection fittings.
A surcharge amounting to € 121.00 will be raised for any order/plans submitted later than 14 calendar days prior to the start of the trade
fair.
For erecting a raised platform on your stand, 80 mm min height
clearance is required for laying pipes.
It is imperative that a ground plan has to be submitted if a main water
connection is required.
Vendor information
Material number: | 38100 |
---|---|
Vendors: |
Similar products
![]() Rental sink unit
€163.00
plus VAT
|
![]() Water for basin/tank – 4 m³ to 10 m³
€141.00
plus VAT
|
![]() Main water connection, upper level (two-storey stand)
€465.00
plus VAT
|
![]() Connection of each additional appliance
€67.50
plus VAT
|